Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Overview of work site ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Site preparation ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

Hangmuren- und Murgangschutz - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 
 

Systemlänge

1100 m

 

Installationsjahr

2017

Ausgangslage

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Massnahme

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

Land/Region

Australien

Kunde

Roads and Maritime Authority, New South Wales

Planer

Department of Public Works, (Project Management)

Ausführende Firma

Specialised Geo Pty Ltd (GHD Contractor)

Subunternehmer

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG ULTRACOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Fernüberwachung
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail