Schweiz
Schweiz

myGeobrugg

Brooklyn NSW, RMS M1 Freeway South

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Rockfall fence on top and rockfall drape covering the rockface

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Detail: End of the catch fence (rockfall barrier along the ridge)

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Fence termination

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Detail: Top of the catch fence

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Detail - bottom of the catch fence

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Installation of the rockfall drape

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Unrolling the drape mesh on the rockface

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

In order not to block the traffic, the protection had to be installed at night

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Detail: top wire rope

Steinschlagschutz - Brooklyn NSW, RMS M1 Freeway South 2019

Uneven crest, tidy meshing job

 
 

Installationsjahr

2019

Ausgangslage

M1 Freeway is the part of the National Road Network and connects Sydney to Newcastle. It is a three-lane freeway cutting through high sandstone cuttings. Historically the solution has been spot bolting as a means of addressing small rockfall. After a long study, it was determined that the ideal solution would be mesh drapes.

Massnahme

We supplied 14‘000  of G80/3 (powdercoated matt black) for the drapes and 570 l/m of T10 Barriers in three sections also powdercoated black.

Kunde

Roads and Maritime Services

Ausführende Firma

Retaining Specialists Pty Ltd

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail