USA
USA

myGeobrugg

Böschungsstabilisierung - Álvaro Casanova 2022

Mesh detail

Böschungsstabilisierung - Álvaro Casanova 2022

One month after installation: stabilized slope with beginning revegetation

Böschungsstabilisierung - Álvaro Casanova 2022

Side view of the project

Böschungsstabilisierung - Álvaro Casanova 2022

Side view from another perspective

 

Installationsjahr

2022

Ausgangslage

Slope stabilization in a residential area in La Reina, a neighborhood located on the eastern side of Santiago, Chile’s capital city.

Massnahme

A slope located in the surrounding area of La Reina required surface stabilization. The goal was to achieve a solution that would allow the revegetation of the system and replace a shotcrete solution.

Kunde

Ferrara

Geschützte Objekte

Wohngebiet

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail