This attenuator protects the railway in Stanwell Park in NSW, Australia. Find the technical details in our project database.
Here comes the updated version with new chapters on CE-marking, large field tests, and our dimensioning tool RUVOLUM®. Available as a PDF on geobrugg.com/downloads
We are offering webinars: Geobrugg experts from all over the world present basic and advanced topics on geohazard, mining and motorsport protection.
Brugg Kabel AG, one of the 5 divisions of the BRUGG Group to date, has been incorporated into the Italian Terna Group as of 1 March 2020. BRUGG GROUP media release
Geobrugg's TECCO® system has once again received approval from the German Federal Railway Authority. The system fulfills the rigorous requirements since 2009 and is allowed to be used for slope stabilization on the federal railways. Approval in German (28 pages)
112 meters of a flexible ring net barrier with a capacity of over 10,000 kJ! Installed in Mölltal, Austria, protecting a residential area and the main traffic route. See a videoclip of the prehistory and the installation itself here.
The Geobrugg SPIDER® avalanche prevention system protects the main road on the island Sørøya / Norway from avalanches and rockfalls during the snow-free period.
See footage of the installation in the fantastic landscape.
Find project Details here
This rockfall occurred on October 17, at the Brünigpass (Switzerland). The most massive blocks were estimated at 3.5 cubic meters. No people were injured. The barriers - their height is six meters - will be repaired in November.
Detailed information on the project
October 22, 2019: A four-ton block had come loose above the village of Valwig at the River Moselle. Fortunately, the rock was stopped by a catch fence. This rockfall barrier model GBE-1000A was built in 2013. With some minor repairs, it will remain fully functional.