BRUGG Grubunun bir girişimidir
Deutsch
Français
Italiano
English
Español
Português
Polski
Türkçe
Română
Bulgarian
Japanese
Russian
Dil DEFRITENESPTPLTRROBGJPRU


Arama
 
FENCEBOX® rollaway fence system installation steps


FENCEBOX® rollaway fence system installation steps

Remove the posts and the end post from the rollaway fence box containing the vertically rolled rollaway fence and erect them as appropriate. The suspension cable is drawn out of the rollaway fence box from the suspension cable reel and attached in the end post or end-piece to a wall, pillar, column, fence system or the next rollaway fence box etc. and finally tensioned by means of the hand crank.

Now the rollaway fence is withdrawn from the side opening and spread like a curtain over the suspension cable to a maximum length of 50 m and then gets attached to the corresponding fence end.

Finally the rollaway fence is tensioned using the crank handle to bring it into shape. For extra stability and strength the rollaway fence mesh can be fixed to the top and bottom of the posts with special claws. Now the rollaway fence can hardly be distinguished from a fixed fence, though it can be taken down at any time if circumstances change.

    




Geobrugg AG
Aachstrasse 11
CH-8590 Romanshorn / Switzerland
Phone +41 71 466 81 55
Fax +41 71 466 81 50
e-mail: info@geobrugg.com


Site plan

Ana Sayfa   Contact  Disclaimer  Sitemap   


Ana Sayfa  » > FENCEBOX® çek-aç çit sistemi » FENCEBOX® kurulum adımları